Townsville Marine Precinct Development

Array
(
    [0] => steel-detailing
)
  • Client: Townsville Marine
  • Project Type: steel detailing |
  • 3D modelling and detailing of all temporary and permanent works.
  • Temp works includes all access platforms, walkways, lifting jigs, pile clamps, headstock access platforms and catwalks. All Jig frames for multi pile driving.
  • Installation 100% with no re-work required.

Back to Projects

(07) 4772 6070
4 Somer Street, Hyde Park 4812
PO Box 3221 Hermit Park, QLD 4812

Email Us linkedinLinkedIn
ASI AISD