Lucinda - Tropical Cyclone Yasi Re-development Project
Array
(
[0] => steel-detailing
)
- Project Type: steel detailing |
- 3D modelling and detailing of all temporary and permanent works.
- Temp works includes all access platforms, walkways, lifting jigs, pile clamps.
- Permanent works includes
- 53m long single welded frame Fender Truss.
- Cross Under Walkways
- Dolphin Berth Access BD6 & BD8 & BD7
- Northern Walkway
- Ship loader Secondary Strong Point
- Northern Strongpoint
- Wharf Roadway Access Frame
- Installation 100% with no re-work required.