IPL Phosphate Hill Ammonia Separation Modifications

Array
(
    [0] => 3d-laser-scanning
)
  • Client: Incitec Pibot Limited
  • Project Type: 3d laser scanning |
  • Brownfield scanning of existing area for ‘as built’ tie in.
  • New piping tie-in review for separation modification project.
  • Qualification in workshop for fabrication accuracy to detail drawings.
  • Installation 100% with no re-work required.

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and steel framing in commercial, mining and marine sectors.

Back to Projects

(07) 4772 6070
4 Somer Street, Hyde Park 4812
PO Box 3221 Hermit Park, QLD 4812

Email Us linkedinLinkedIn
ASI AISD