  • Client: Bingera Sugar Mill

Bingera sugar mill suffered millions of dollars of damage after a fire tore through the building.

DM Group were engaged to 3d laser scan the existing 80m long conveyor and supporting members for full replacement & rectification.

Interesting facts;

3 man site crew flew down over Saturday and Sunday to 3d laser scan the existing (burnt) conveyor, supporting structure, existing building frame, head chute, GTU (Gravity take-up unit), tail chute, and surrounding concrete profiles.

DM Group office completed the following in 1 (one) week with an 8 man modeling/ design and detailing team all working in coordination with each other;

  • As built modelling of existing structure/ conveyor etc.
  • New proposed design, arrangement and conveyor profiling for client approval.
  • Engineering drawings and documentation for upgrade of existing support structure.
  • Design & engineering on conveyor gallery, GTU, head and tail chutes, gearbox, bearings, shafts and guarding.
  • Full fabrication package for all works.
  • Installation 100% with no re-work required.

Come and have a talk to us about how we can assist with your project.

We cover all areas of 3D Laser scanning, design, drafting, steel detailing and framing in commercial, mining and marine sectors.

Back to Projects

(07) 4772 6070
4 Somer Street, Hyde Park 4812
PO Box 3221 Hermit Park, QLD 4812

Email Us linkedinLinkedIn
ASI AISD